DUAL COMPLETION SRP-ESP
- Simultaneous dual oil production from two formations and separate flow rate metering.
Dual completion SRP-ESP equipment is used for simultaneous dual oil production from two formations according to scheme: bottom – SRP, top – ESP.
APPLICATION
Simultaneous dual oil production from two formations and separate flow rate metering.
ADVANTAGES
- Separate metering of produced fluid;
- Separate adjustment of each pump;
- Smaller system dimensions due to concentric arrangement of production strings;
- Separate sampling from each formation without well stop.
BENEFITS
- Increased oil production by eliminating formations interaction;
- Decreased drilling footage;
- Decreased well start-up time;
- Killing of each formation without packer unset;
- (De-) installation with standard equipment and tools by workover crews;
- Separate drives for each pump to operate in case the other one is idle;
- SRP replacement without tubing string rising and packer unset;
- ESP replacement without packer unset;
- Technological service provided by manufacturer: selection, production, installation, supervision and maintenance.
ORDER REFERENCE
DUAL COMPLETION SRP-ESP
Specifications
Casing ID, inch (mm) | not less than 5 (127) |
Tubing OD, inch (mm) | from 2 7/8 (73) |
SRP max. setting depth, ft (m) | up to 5905 (1800) |
SRP estimated flow rate, bopd (m3/d) | up to 345 (55) |
ESP max. setting depth, ft (m) | up to 11480 (3500) |
ESP estimated flow rate, bopd (m3/d) | up to 2200 (350) |
Delivery
Delivery of your order is possible in the following ways:
- Pickup from the factory;
- Delivery to the address by courier service;
- Delivery to other regions by forwarding agent;
Terms of payment
You can submit an application in the following ways:
- By the phone numbers listed on the website or Contacts page;
- Leave a request on the product page, indicating your contact information;
- Send an email with the required position;