• Sand anchor neutralizes or substantially reduces negative effects of solids penetrating operating components of pumping and surface equipment.

Sand anchor with bypass valve neutralizes negative effects of solids on pumping equipment and prevents failures.

Application

Sand anchor neutralizes or substantially reduces negative effects of solids penetrating operating components of pumping and surface equipment.

Advantages

  • High separation coefficient – up to 95%;
  • Adjustable sand trap length– 33-330 ft (10-100 m);
  • Bypass valve prevents pump gas lock if sand trap is full;
  • Corrosion-resistant steel liner protects separator body from abrasive wear;
  • Sealing section tightly fits casing and shuts off annular space;

Benefits

  • Prevents early wear of downhole pumping equipment;
  • Reduced risk of failure of downhole pumping equipment caused by pump clogging;
  • Longer runlife of pumping equipment;
  • Reduced well repair cost;
  • Higher efficiency of pumping equipment;

Order reference

25-PGB-ESP-168/9
25 (2 7/8”) – tubing ID
168 (6 5/8”) – casing ID
9 (0.35”) – casing wall thickness

Specifications
Pump type ESP, PCP, ESPCP, SRP
Casing ID, inch (mm) 5 3/4 (146), 6 5/8 (168), 7 (178)
Anchor setting angle, degree 146, 168, 178
Flow rate, bopd (m3 /d) up to 3144 (500)
Pressure drop to open bypass valve, MPa (Psi) 0.2 (2)
Delivery

Delivery of your order is possible in the following ways:

  • Pickup from the factory;
  • Delivery to the address by courier service;
  • Delivery to other regions by forwarding agent;
Terms of payment

You can submit an application in the following ways:

  • By the phone numbers listed on the website or Contacts page;
  • Leave a request on the product page, indicating your contact information;
  • Send an email with the required position;

We offer technical support on equipment selection and operation

Get your consultation and quote by filling the form below

Or call: 8 (7152) 46-72-77
  • Turnkey installations
  • Personal manager
  • 20+ years of experience
  • Oil production equipment
  • Well analysis and equipment selection
  • Warranty & post-warranty support
  • OEM prices
  • Package supplies
  • Efficient production solutions
  • Turnkey installations
  • Personal manager
  • 20+ years of experience
  • Oil production equipment
  • Well analysis and equipment selection
  • Warranty & post-warranty support
  • OEM prices
  • Package supplies
  • Efficient production solutions
Catalogue View all Menu

Searh for...? For example,Pump