Wellhead Equipment for memory production logging WH-slickline
- Sealing the wellhead during the lowering of development control equipment and sampling of well fluid
Wellhead equipment for wire-based geophysical surveys is designed to seal the wellhead during the lowering of development control equipment and sampling of well fluid.
Composition:
- Base attaches to fountain equipment through a gasket;
- Blowout preventer with manual ram drive;
- Catcher;
- Lubricator;
- Cable seal with hydraulic packing gland pressure;
- Measuring roller installed on the lubricator;
- Upper roller installed on the lubricator.
Name |
WH-slickline |
Maximum pressure at wellhead MPa / Psi |
25 / 3625 |
Ambient temperature °C / °F |
-40…+40 / -40…+104 |
Relative humidity % |
98 |
Maximum cable pulling force kN |
5 |
Maximum roller load kN |
10 |
Maximum cable movement speed m/h / ft/h |
6000 / 19685 |
Maximum cable diameter mm / in. |
3 / 0,118 |
Circumference of measuring roller mm / in. |
500 / 19 |
Circumference of upper roller mm / in. |
500 / 19 |
Maximum equipment assembly height mm / in/ |
2700 / 106 |
Maximum equipment assembly weight kg / lb |
180 / 396 |
Delivery of your order is possible in the following ways:
- Pickup from the factory;
- Delivery to the address by courier service;
- Delivery to other regions by forwarding agent;
You can submit an application in the following ways:
- By the phone numbers listed on the website or Contacts page;
- Leave a request on the product page, indicating your contact information;
- Send an email with the required position;